Haomei tread plate > Haomei News > How to install of aluminium tread plate sheet ?

How to install of aluminium tread plate sheet ?

Writer:Admin   Time:



    The choice of screw head does not reveal the connection method, that is, a pattern of aluminum plate with one end of the screw fixed, the other end of a pattern of aluminum one part deep, just cover the screw, the facade role, because the aluminium tread plate between the aluminum strip 6mm Section of the gap, so a vertical concave into the line angle, enriched the facade of the building, breaking the monotonous feeling.aluminium tread plate cape town

    If the aluminium tread plate sheet is steel skeleton, you can first drill with a drill screw in the direction of drilling a hole, the aperture should be based on the standard screw resolution, and then aluminum plate with self-tapping screws firmly. If the wooden frame, it should be directly with the wood screw aluminium tread plate sheet screwed on the skeleton.aluminium tread plate sizes

    The gap between the aluminium tread plate sheet and the aluminium tread plate sheet is usually 5 to 10 mm and is disposed of with elastic material such as rubber strip or sealant.

    aluminium tread plate weight, aluminum alloy aluminum plate;Email:sarah@aluminium24.eu